Complete Custom Perfume Cap Production Timeline From Design To Shipment

Content: Knowing the whole production cycle helps you arrange new perfume launch schedule reasonably. The full process is divided into 6 stages

1.Design & 3D Rendering (2-3 days)

Send your sketch, brand logo, bottle size to our design team, we output high-definition 3D pictures for confirmation, adjust shape and structure for free.

2.Mold Opening (30 days)

After design confirmation, mold workshop starts carving die-casting mold, test size and thread matching repeatedly.

3.Sample Production (3-5 working days)

Complete die casting, polishing, electroplating, enamel filling and logo processing to finish physical samples, send samples to you for color and texture confirmation.

4.Mass Production Arrangement (After sample approval)

Arrange raw material feeding, batch die casting, secondary polishing to unify surface smoothness.

5.Surface Craft & QC

Inspection Unified electroplating and enamel production, strict salt spray, torsion, leakage test one by one, pick out defective products.

6.Packaging & Shipment (3-4 days)

Each cap packed with anti-scratch PE bag, filled with shockproof foam in export cartons, arrange sea/air freight according to your demand.

Total cycle reference: Stock caps 3-7 days; simple custom caps 12-18 days; complex multi-color enamel special-shaped caps 20-28 days. Share your perfume launch schedule, we will arrange priority production for your order.

If you are looking for a professional one-stop zamac enamel perfume cap manufacturer with full certificates, fast sampling and stable quality, send your design drawing, bottle size or brand demand to us now. We will provide free custom design renderings, sample quotation and factory inspection support within 24 hours.

Leave a Comment

Your email address will not be published. Required fields are marked *